Managed to get a bit of time in on this over this and last weekend and finally have a rolling frame. New tyres I'll worry about when it's closer to finished.



The rear wheel has been resprayed and polished, fitted with new wheel bearings and locking collar and an 'as new' driven flange. The brakes also have new shoes. This wheel also has a very good brake drum with very little movement of the bellcrank before engagement of the brakes.
The riders footpegs have been rebuilt and are fitted with new rubbers. The brake lever is NOS and I'm fortunate it turned up on ebay as all the brake levers here are defective in some way, be it lousy chrome, roadrash or mangled stoppers from the bikes being dropped. This lever was listed on ebay for all of about five minutes.
The sidestand is fitted with a new rubber and spring. The centrestand scored a new spring too. I had a very nice spring for the brake pedal so no new spring for that.
Ignore the key holding the brake torque arm in place on the rear brake plate, I'm still preparing the bolt for that.
The new frame plugs and rubber cover for the swingarm adjuster were kindly sourced for me by Victor.
